Construction AI · AI teammate

Walter

An AI teammate for general contractors that tracks every notice clock and drafts the paperwork you approve.

A 30-second film about Walter: Half the day is chasing. Walter reads every answer. Every notice clock, tracked. You approve everything that binds you. An AI teammate for general contractors.

What Walter does

Walter reads a construction project's email and documents, tracks every notice clock, and drafts RFIs, change orders and pay-app paperwork — and a person approves anything binding before it goes out. Walter is in early access; the product screens in this film are illustrative.

The film in 5 lines

  1. 01Half the day is chasing.
  2. 02Walter reads every answer.
  3. 03Every notice clock, tracked.
  4. 04You approve everything that binds you.
  5. 05An AI teammate for general contractors.
Full on-screen transcript
  • Half the day is chasing.
  • Walter reads every answer.
  • Every notice clock, tracked.
  • You approve everything that binds you.
  • An AI teammate for general contractors.
  • Early access
  • Illustrative UI
  • walter / riverside-tower-a
  • RFI 188 answered · Firestopping at Level 3
  • RFI 188 · Response
  • Firestopping at Level 3
  • Riverside Tower A · Answered by the architect · 9:14
  • Confirm firestopping scope at Level 3 penetrations.
  • Provide firestopping at every Level 3 penetration.
  • Ref: A-501 Rev 5
  • Walter read this
  • RFI 188 answer adds firestopping at every Level 3 penetration
  • Not bid
  • Change event opened
  • Change Orders · notice clock starts today
  • Notice due in 10 days
  • Notice clock
  • CE-042 · Firestopping, Level 3
  • days to give notice
  • Changed conditions — Tower A footings
  • 2 days left
  • Pay app 7 is one conditional waiver short
  • Waiver gate
  • Notice of change
  • To: Owner · Riverside Tower A · Re: RFI 188
  • Per the architect's answer to RFI 188, firestopping is now required at every Level 3 penetration. This work was not in our bid.
  • Drafted by Walter
  • Needs your approval
  • walter / approval queue
  • PM view
  • Eleven things handled. Three waiting on you.
  • Drafted by Walter from the project's email and documents.
  • RFI 188 — Firestopping at every Level 3 penetration
  • To: Owner · drafted from the architect's answer
  • 10 days left
  • Draft change order
  • $48,200 · Firestopping, Level 3
  • Cites A-501 Rev 5 · IFC 2026-03-14
  • Lien waiver gate
  • Pay app 7 · 3 of 9 subs
  • Waivers collected before the pay app goes out
  • Waiting on subs
  • Review diffs
  • Approve
  • Approved by you
  • Nothing leaves the building without your approval.

Have a product in mind?

We design, build and ship AI products like Walter. Start with a free audit of what you want to build.

Request Free Audit